Airworthiness Bulletins

Airframes
28 - Fuel systems

AWB Title Effective
28-1 Issue 1 Fuel Tank Safety 23 July 2002
28-2 Issue 1 Fuel Quantity Measurement and Verification Process - CANCELLED (see CAAP 234-1(1)) 15 May 2006
28-3 Issue 1 Aircraft Fuel 4 January 2007
28-4 Issue 2 Cirrus SR 20 and SR22 Aircraft Fuel System Inspection 9 February 2007
28-5 Issue 1 Fuel Pump Diaphragm Assembly 5 September 2007
28-6 Issue 1 Cessna Fuel Stabilisation 31 October 2007
28-7 Issue 1 Fatigue Failures of Copper Alloy Fuel and Oil Pipes 19 February 2008
28-8 Issue 1 Water Contamination of Fuel because of Failure of Fuel Filler Cap 28 February 2008
28-9 Issue 1 Main Tank Fuel Vent Line Blockages on Beechcraft C90A aircraft 28 February 2008
28-10 Issue 1 Cessna 310 Aircraft - Auxiliary Fuel Tank Check Valve 28 February 2008
28-11 Issue 1 Beechcraft 200 Fuel Quantity System 24 July 2008
 
Contact CASA